Rates
The Board of Commissioners of Liberty Lake Sewer & Water District has the legal authority, as established by Washington State law, to determine fees and set rates.
Monthly Residential / Commercial Rates
|
Type |
Monthly Cost |
|
Water, metered, base per ERU* |
$10.08 + tax |
|
Usage above 976 cu.ft. per ERU* |
$0.0039/cu.ft. + tax |
|
Usage above 3131 cu.ft per ERU* |
$0.0062/cu.ft. + tax |
|
Sewer, per ERU* |
$27.00 + tax |
|
Sewer, Dedicated Capacity (Contract) |
$19.84 + tax |
*ERU=Equivalent Residential Unit
Connection Fees
|
Type |
Cost |
|
Regular Capacity Water, per ERU |
$2,000 |
|
Regular Capacity Sewer, per ERU |
$4,552 |
|
Total: |
$6,552 |
Hook-Up Fees
|
Type |
Cost |
|
Residential/Commercial Water* ¾ to 2" meters |
$300 |
|
Residential/Commercial Water* Larger than 2" meters |
$350 |
|
Residential/Commercial Sewer |
$100 |
|
Total: |
$400 to $450 |
Fire Flow Charges
|
Required Flow (GPM) |
Gallons per Minute |
||||||
|
750 |
1000 |
1500 |
2000 |
2500 |
3000 |
3500 |
|
|
Fire Flow Charge* |
COST |
||||||
|
$530 |
$671 |
$1006 |
$1340 |
$1674 |
$2001 |
$2341 |
|
*Fire Flow charges will be assessed in accordance with Resolution 79-85 based on the required Fire Flow established by Fire District #1 or Spokane County Department of Building.
Stormwater Drainage for Residential Homes Within the Watershed of Liberty Lake
|
Stormwater Drainage Plan Review* |
$600 |
|
Stormwater Drainage Bank Assignment (Returned upon project completion) |
$3000 |
*Covers the initial plan review and a check of the final plan, three site drainage inspections (rough, preliminary-final and final), and stormwater barrier (silt fence) installation. All additional reviews to be billed to the developer/customer at actual cost plus tax.