The Board of Commissioners of Liberty Lake Sewer & Water District has the legal authority, as established by Washington State law, to determine fees and set rates. Rates may vary by area.
Monthly Residential / Commercial Rates
|
Type
|
Monthly Cost
|
| Water, metered, base per ERU* |
$10.08 + tax |
| Usage above 976 cu.ft. per ERU* |
$0.0039/cu.ft. + tax |
| Usage above 3131 cu.ft per ERU* |
$0.0062/cu.ft. + tax |
| Sewer, per ERU* |
$29.16 + tax |
| Sewer, Dedicated Capacity (Contract) |
$22.38 + tax |
*ERU=Equivalent Residential Unit
Connection Fees
|
Type
|
Cost
|
| Regular Capacity Water, per ERU |
$2,000 |
| Regular Capacity Sewer, per ERU |
$7,875 |
|
Total:
|
$9,875 |
Hook-Up Fees
| Type |
Cost |
| Residential/Commercial Water ¾” to 1″ meters |
$350 |
| Residential/Commercial Water Larger than 1″ meters |
Owner provided |
| Residential/Commercial Sewer |
$100 |
| Radio Read Hook-Up Fee |
$150 |
| Water Tapping Fee |
$225 |
| Sewer Tapping Fee |
$125 |
Fire Flow Charges
| Required Flow (GPM) |
Gallons per Minute
|
|
750
|
1000
|
1500
|
2000
|
2500
|
3000
|
3500
|
| Fire Flow Charge* |
COST
|
|
$530
|
$671
|
$1006
|
$1340
|
$1674
|
$2001
|
$2341
|
*Fire Flow charges will be assessed in accordance with Resolution 79-85 based on the required Fire Flow established by Fire District #1 or Spokane County Department of Building.
Stormwater Drainage for Residential Homes Within the Watershed of Liberty Lake
| Stormwater Drainage Plan Review* |
$600 |
| Stormwater Drainage Bank Assignment (Returned upon project completion) |
$3000 |
*Covers the initial plan review and a check of the final plan, three site drainage inspections (rough, preliminary-final and final), and stormwater barrier (silt fence) installation. All additional reviews to be billed to the developer/customer at actual cost plus tax.